Baseline Road over RWCD Floodway
0.5 mi W of Power Rd · County 013, Arizona · Built 1983 · 4 Lanes · 19,867 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
33.379333, -111.696667
This bridge is in worse condition than 78.1% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 43 years old.
Nearby Bridges
Baseline Road over RWCD Canal
Built 1983
Superst Sprgs Blvd over US 60
Built 1988
US 60 over RWCD Canal
Built 1984
Sprstn Sprgs Blvd over Storm Drain
Built 1988
Power Road over US 60
Built 1984
Power Road over Storm Drain
Built 1984
Guadalupe Rd over E Maricopa Fldwy
Built 1986
Southern Ave over RWCD Floodway
Built 1987
Guadalupe Road over Drain Channel
Built 1990
Clearview Avenue over US 60
Built 1988
Bridge Details
- Structure #
- 09823
- Year Built
- 1983
- Length
- 45.7 m (149.9 ft)
- Max Span
- 10.1 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 4
- Daily Traffic
- 19,867
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.