Upper Lake_Drive over _Mosquito Branch

_5 mi N of Hwy11 · County 125, Alabama · Built 2016 · 2 Lanes · 125 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021233
Year Built
2016
Length
10.4 m (34.1 ft)
Max Span
10.4 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
125
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$351,000
Total Project Cost
$386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.