HURRICANE RD over COTTON DALE CREEK

.7 MI. NE OF JCT US 11 · County 125, Alabama · Built 2004 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019673
Year Built
2004
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$815,000
Total Project Cost
$897,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.