I-59 over NS RR Active * US 11

OVER NS RR AND US 11 · County 125, Alabama · Built 2017 · 6 Lanes · 61,767 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
020732
Year Built
2017
Length
117.3 m (384.8 ft)
Max Span
82.3 m
Width
47.2 m (154.9 ft)
Lanes
6
Daily Traffic
61,767
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,390,000
Total Project Cost
$14,729,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.