CR 85 BUTTERMILK over I-59

1.6 MI N OF COTTONDALE · County 125, Alabama · Built 1989 · 3 Lanes · 8,015 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
014782
Year Built
1989
Length
103.6 m (339.9 ft)
Max Span
26.2 m
Width
17.3 m (56.8 ft)
Lanes
3
Daily Traffic
8,015
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,331,000
Total Project Cost
$4,764,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.