LANDFILL ROAD over I - 65
BETWEEN CORR X * US 31 IN · County 073, Alabama · Built 2011 · 2 Lanes · 100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.578256, -86.812386
This bridge is in worse condition than 25.4% of bridges in County 073. The average bridge in Alabama is 0 years old; this one is 15 years old.
Nearby Bridges
I-65 S TO I-22 W over N.S.R.R.
Built 2015
I - 65 TO I - 22 over I - 65
Built 2015
I - 22 WEST over NORFOLK SOUTHERN
Built 2015
I - 22 EAST over NORFOLK SOUTHERN
Built 2015
I - 65 SOUTH over INACTIVE I - 22
Built 2015
I - 65 NORTH over PROPOSED I - 22
Built 2014
I - 22 & I - 65 over I - 65
Built 2016
I - 65 NB RAMP over CORRIDOR X
Built 2014
RAMP A over I - 65
Built 1975
RAMP C over I - 65
Built 1975
Bridge Details
- Structure #
- 019046
- Year Built
- 2011
- Length
- 165.1 m (541.7 ft)
- Max Span
- 32.3 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,966,000
- Total Project Cost
- $5,463,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.