I - 65 TO I - 22 over I - 65

I - 22 WBR · County 073, Alabama · Built 2015 · 2 Lanes

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
019704
Year Built
2015
Length
874.5 m (2869.1 ft)
Max Span
103.1 m
Width
18 m (59.1 ft)
Lanes
2
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$35,378,000
Total Project Cost
$38,916,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.