I - 65 NB RAMP over CORRIDOR X

I-65/CORR X INTERCHANGE · County 073, Alabama · Built 2014 · 3 Lanes · 7,575 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019047
Year Built
2014
Length
107.3 m (352 ft)
Max Span
32.3 m
Width
22.4 m (73.5 ft)
Lanes
3
Daily Traffic
7,575
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,821,000
Total Project Cost
$6,403,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.