RAMP TO I-65 N over SOUTHERN RR.

BETWEEN 41ST * and I-22 · County 073, Alabama · Built 2013 · 2 Lanes · 7,575 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019043
Year Built
2013
Length
103.6 m (339.9 ft)
Max Span
30.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
7,575
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,248,000
Total Project Cost
$3,573,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.