RAMP NWCDX over N. S. Railroad

INTERCHANGE · County 073, Alabama · Built 2014 · 1 Lanes

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
020194
Year Built
2014
Length
211.5 m (693.9 ft)
Max Span
35.5 m
Width
11.9 m (39 ft)
Lanes
1
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,656,000
Total Project Cost
$6,222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.