I-65 S TO I-22 W over N.S.R.R.

I-22/I-65 INTERCHANGE · County 073, Alabama · Built 2015 · 1 Lanes

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
020195
Year Built
2015
Length
175.3 m (575.1 ft)
Max Span
38.1 m
Width
8.6 m (28.2 ft)
Lanes
1
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,500,000
Total Project Cost
$3,850,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.