RAMP C over I - 65

FULTONDALE INTERCHANGE · County 073, Alabama · Built 1975 · 1 Lanes · 7,575 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
011350
Year Built
1975
Length
128.6 m (421.9 ft)
Max Span
35.1 m
Width
8 m (26.2 ft)
Lanes
1
Daily Traffic
7,575
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,441,000
Total Project Cost
$2,685,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.