I-65 over SPRING HILL AVE

0.2 MI S US 98 · County 097, Alabama · Built 1962 · 7 Lanes · 97,939 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
013811
Year Built
1962
Reconstructed
1986
Length
64.3 m (211 ft)
Max Span
24.4 m
Width
41.7 m (136.8 ft)
Lanes
7
Daily Traffic
97,939
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,967,000
Total Project Cost
$7,664,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.