US 98 EB over THREE MILE CREEK

0.1 MI W I-65 · County 097, Alabama · Built 1978 · 3 Lanes · 18,275 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
011821
Year Built
1978
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
15.2 m (49.9 ft)
Lanes
3
Daily Traffic
18,275
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,085,000
Total Project Cost
$2,294,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.