I-65 over Bike Trail (Former RR)

0.7 MI N US 45 · County 097, Alabama · Built 1965 · 9 Lanes · 78,895 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
015503
Year Built
1965
Reconstructed
1992
Length
69.8 m (229 ft)
Max Span
19.2 m
Width
49.2 m (161.4 ft)
Lanes
9
Daily Traffic
78,895
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,846,000
Total Project Cost
$9,731,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.