DAUPHIN ST over I-65

I-65 @ DAUPHIN ST · County 097, Alabama · Built 1962 · 6 Lanes · 31,399 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
013809
Year Built
1962
Reconstructed
1986
Length
86 m (282.2 ft)
Max Span
23.8 m
Width
26.5 m (86.9 ft)
Lanes
6
Daily Traffic
31,399
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,654,000
Total Project Cost
$6,219,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.