DAUPHIN STREET over DRAINAGE DITCH

1033 E I65 · County 097, Alabama · Built 1964 · 5 Lanes · 31,399 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
008400
Year Built
1964
Length
9.8 m (32.2 ft)
Max Span
3 m
Width
51.3 m (168.3 ft)
Lanes
5
Daily Traffic
31,399
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,050,000
Total Project Cost
$1,155,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.