CTH P over BIG SLOUGH CREEK
1.3M E JCT STH 121 · County 121, Wisconsin · Built 1960 · 2 Lanes · 303 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
44.422639, -91.177889
This bridge is in worse condition than 87.3% of bridges in County 121. The average bridge in Wisconsin is 0 years old; this one is 66 years old.
Nearby Bridges
CTH P over BIG SLOUGH CREEK
Built 1971
CTH P over BIG SLOUGH CREEK
Built 2019
STH 121 over BIG SLOUGH CREEK
Built 2004
LRD STEIG COULEE R over PIGEON CREEK
Built 1964
LRD LEER RD (DEAD over BR STEIG COULEE CREEK
Built 2004
LRD CHRISTOPHERSON over TOMTER COULEE CREEK
Built 1926
USH 53 over PIGEON CREEK
Built 1978
USH 53 NB over TOMTER COULEE CR
Built 2003
LRD HUSKELHUS RD over PIGEON CREEK
Built 1980
LRD FULLER COULEE over PIGEON CREEK
Built 1969
Bridge Details
- Structure #
- P61094500000000
- Year Built
- 1960
- Length
- 7.3 m (24 ft)
- Max Span
- 6.9 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 303
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $112,000
- Total Project Cost
- $168,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.