CTH P over BIG SLOUGH CREEK
1.9M E JCT STH 121 · County 121, Wisconsin · Built 2019 · 2 Lanes · 325 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 9 | Excellent |
Location
44.414694, -91.172167
This bridge is in worse condition than 16.2% of bridges in County 121. The average bridge in Wisconsin is 0 years old; this one is 7 years old.
Nearby Bridges
CTH P over BIG SLOUGH CREEK
Built 1971
CTH P over BIG SLOUGH CREEK
Built 1960
STH 121 over BIG SLOUGH CREEK
Built 2004
LRD STEIG COULEE R over PIGEON CREEK
Built 1964
LRD CHRISTOPHERSON over TOMTER COULEE CREEK
Built 1926
USH 53 over PIGEON CREEK
Built 1978
LRD LEER RD (DEAD over BR STEIG COULEE CREEK
Built 2004
LRD HUSKELHUS RD over PIGEON CREEK
Built 1980
USH 53 NB over TOMTER COULEE CR
Built 2003
LRD FULLER COULEE over PIGEON CREEK
Built 1969
Bridge Details
- Structure #
- B61023400000000
- Year Built
- 2019
- Length
- 11.8 m (38.7 ft)
- Max Span
- 11 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 325
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.