USH 53 NB over TOMTER COULEE CR
0.6M N JCT STH 121 TO E · County 121, Wisconsin · Built 2003 · 2 Lanes · 2,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
44.434389, -91.209306
This bridge is in worse condition than 69.9% of bridges in County 121. The average bridge in Wisconsin is 0 years old; this one is 23 years old.
Nearby Bridges
LRD CHRISTOPHERSON over TOMTER COULEE CREEK
Built 1926
USH 53 over PIGEON CREEK
Built 1978
LRD LEER RD (DEAD over BR STEIG COULEE CREEK
Built 2004
LRD STEIG COULEE R over PIGEON CREEK
Built 1964
STH 121 over BIG SLOUGH CREEK
Built 2004
LRD FULLER COULEE over FULLER COULEE CREEK
Built 1986
LRD FULLER COULEE over FULLER COULEE CREEK
Built 1976
LRD FULLER COULEE over FULLER COULEE CR
Built 2002
LRD FULLER COULEE over PIGEON CREEK
Built 1969
CTH P over BIG SLOUGH CREEK
Built 1960
Bridge Details
- Structure #
- B61016900000000
- Year Built
- 2003
- Length
- 15.1 m (49.5 ft)
- Max Span
- 13.7 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.