LRD CHRISTOPHERSON over TOMTER COULEE CREEK
0.2M E JCT USH 53 · County 121, Wisconsin · Built 1926 · 2 Lanes · 800 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
44.429472, -91.208111
This bridge is in worse condition than 69.9% of bridges in County 121. The average bridge in Wisconsin is 0 years old; this one is 100 years old.
Nearby Bridges
USH 53 over PIGEON CREEK
Built 1978
USH 53 NB over TOMTER COULEE CR
Built 2003
LRD STEIG COULEE R over PIGEON CREEK
Built 1964
LRD LEER RD (DEAD over BR STEIG COULEE CREEK
Built 2004
STH 121 over BIG SLOUGH CREEK
Built 2004
LRD FULLER COULEE over PIGEON CREEK
Built 1969
LRD FULLER COULEE over FULLER COULEE CREEK
Built 1976
LRD FULLER COULEE over FULLER COULEE CREEK
Built 1986
LRD FULLER COULEE over FULLER COULEE CR
Built 2002
CTH P over BIG SLOUGH CREEK
Built 1960
Bridge Details
- Structure #
- P61070300000000
- Year Built
- 1926
- Length
- 8.5 m (27.9 ft)
- Max Span
- 8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 800
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.