LRD FULLER COULEE over FULLER COULEE CREEK

0.8M W JCT USH 53 · County 121, Wisconsin · Built 1986 · 2 Lanes · 94 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P61013800000000
Year Built
1986
Length
7.3 m (24 ft)
Max Span
7 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
94
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.