STH 23 EB-KOHLER D over LRD TAYLOR DR

1.8M E JCT IH 43 TO S · County 117, Wisconsin · Built 1979 · 2 Lanes · 16,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 8 Very Good
Substructure 6 Satisfactory

Location

43.756328, -87.750792

This bridge is in worse condition than 40.2% of bridges in County 117. The average bridge in Wisconsin is 0 years old; this one is 47 years old.

Nearby Bridges

Bridge Details

Structure #
B59010300000000
Year Built
1979
Length
49.3 m (161.7 ft)
Max Span
24.8 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
16,400
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.