CTH TAYLOR DRIVE ( over CNW RR

0.3M N JCT CTH PP · County 117, Wisconsin · Built 1985 · 2 Lanes · 14,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B59011700000000
Year Built
1985
Length
45.6 m (149.6 ft)
Max Span
16.3 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
14,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$799,000
Total Project Cost
$1,199,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.