CTH TA TAYLOR DRI over CNW RR
0.3M N JCT CTH PP · County 117, Wisconsin · Built 1985 · 2 Lanes · 7,250 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
43.742969, -87.743764
This bridge is in worse condition than 20.9% of bridges in County 117. The average bridge in Wisconsin is 0 years old; this one is 41 years old.
Nearby Bridges
CTH TAYLOR DRIVE ( over CNW RR
Built 1985
CTH TA TAYLOR DRI over SHEBOYGAN RIVER
Built 1985
CTH TAYLOR DR. (CT over SHEBOYGAN RIVER
Built 1985
CTH PP LOWER FAL over SHEBOYGAN RIVER
Built 1970
CTH PP INDIANA AVE over CNW RR
Built 1986
LRD NEW JERSEY AVE over SHEBOYGAN RIVER
Built 1978
LRD GEORGIA AVE over CNW RR
Built 1983
IH 43 over BR SHEBOYGAN RIVER
Built 1966
IH 43 NB over SHEBOYGAN RIVER
Built 1967
IH 43 SB over SHEBOYGAN RIVER
Built 1971
Bridge Details
- Structure #
- B59011600000000
- Year Built
- 1985
- Length
- 45.6 m (149.6 ft)
- Max Span
- 16.3 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 7,250
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $799,000
- Total Project Cost
- $1,199,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.