CTH TA TAYLOR DRI over SHEBOYGAN RIVER

0.1M N JCT CTH PP · County 117, Wisconsin · Built 1985 · 2 Lanes · 7,250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B59011400000000
Year Built
1985
Length
53.9 m (176.8 ft)
Max Span
21.3 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
7,250
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$931,000
Total Project Cost
$1,397,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.