IH 43 SB over CTH O

2.2M S JCT STH 42 · County 117, Wisconsin · Built 2012 · 3 Lanes · 15,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B59018400000000
Year Built
2012
Length
40.4 m (132.5 ft)
Max Span
11 m
Width
16 m (52.5 ft)
Lanes
3
Daily Traffic
15,700
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.