CTH M over N FK SKINNER CREEK

7.9M N JCT USH 8--43 · County 107, Wisconsin · Built 2000 · 2 Lanes · 331 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B54008900000000
Year Built
2000
Length
16.7 m (54.8 ft)
Max Span
7.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
331
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.