CTH M over SKINNER CREEK

5.3 MI N JCT USH 8 · County 107, Wisconsin · Built 2022 · 2 Lanes · 342 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B54013500000000
Year Built
2022
Length
22.4 m (73.5 ft)
Max Span
21.6 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
342
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.