LRD POLGAR RD over SKINNER CR

1.1M W JCT CTH M · County 107, Wisconsin · Built 2004 · 2 Lanes · 62 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B54010900000000
Year Built
2004
Length
28.8 m (94.5 ft)
Max Span
14 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
62
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.