CTH S over ELK RIVER

0.1M N JCT CTH W · County 099, Wisconsin · Built 1986 · 2 Lanes · 97 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
B50004500000000
Year Built
1986
Length
27.7 m (90.9 ft)
Max Span
27.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
97
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.