IH 94 EB-IH 43 SB over LRD MINERAL ST CONNECTOR
0.15 MI S JCT STH 59 · County 079, Wisconsin · Built 1968 · 3 Lanes · 63,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.021131, -87.919564
This bridge is in worse condition than 40.6% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 58 years old.
Nearby Bridges
IH 94 WB|IH 43 NB over LRD MINERAL ST CONNECTOR
Built 1968
IH RAMP STH 59 EB- over LAND
Built 1969
IH RAMP IH 94 WB-W over LRD MINERAL ST CONNECTOR
Built 1969
IH RAMP MINERAL ST over STH WALKER ST RAMPS
Built 1968
IH-94 EB|IH-43 SB over STH 38|W WASHINGTON
Built 1968
IH 94 WB|IH 43 NB over STH 38|W WASHINGTON
Built 1968
IH 94 WB-IH 43 NB over WALKER ST RAMPS
Built 1968
IH 43 SB/94 EB over STH WALKER ST RAMPS
Built 1968
IH RAMP IH 43 SB/9 over STH WALKER ST RAMPS
Built 1968
IH 43 NB/94 WB over STH 59 (NATIONAL AVE)
Built 1968
Bridge Details
- Structure #
- B400286024C0000
- Year Built
- 1968
- Reconstructed
- 1988
- Length
- 118 m (387.1 ft)
- Max Span
- 26.1 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 3
- Daily Traffic
- 63,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,519,000
- Total Project Cost
- $2,279,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.