IH RAMP MINERAL ST over STH WALKER ST RAMPS
1.0 MI S JCT IH 794 · County 079, Wisconsin · Built 1968 · 1 Lanes · 6,900 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.022447, -87.920242
This bridge is in worse condition than 68.5% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 58 years old.
Nearby Bridges
IH 94 WB-IH 43 NB over WALKER ST RAMPS
Built 1968
IH 43 SB/94 EB over STH WALKER ST RAMPS
Built 1968
IH RAMP IH 43 SB/9 over STH WALKER ST RAMPS
Built 1968
IH 43 NB/94 WB over STH 59 (NATIONAL AVE)
Built 1968
IH 43 SB/94 EB over STH 59 (NATIONAL AVE)
Built 1968
IH RAMP MINERAL S over STH 59/NATIONAL AVE
Built 1968
IH 94 EB-IH 43 SB over LRD MINERAL ST CONNECTOR
Built 1968
IH RAMP IH 43SB/94 over STH 59-NATIONAL AVE
Built 1968
IH 94 WB|IH 43 NB over LRD MINERAL ST CONNECTOR
Built 1968
IH 43 NB/94 WB over LRD W PIERCE ST
Built 1968
Bridge Details
- Structure #
- B400285023A0000
- Year Built
- 1968
- Reconstructed
- 1987
- Length
- 68.3 m (224.1 ft)
- Max Span
- 18.7 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 1
- Daily Traffic
- 6,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $903,000
- Total Project Cost
- $1,355,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.