IH-94 EB|IH-43 SB over STH 38|W WASHINGTON

0.2 MI S JCT STH 59 · County 079, Wisconsin · Built 1968 · 4 Lanes · 66,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B400286024A0000
Year Built
1968
Reconstructed
1988
Length
112.8 m (370.1 ft)
Max Span
35.1 m
Width
17.8 m (58.4 ft)
Lanes
4
Daily Traffic
66,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,455,000
Total Project Cost
$2,182,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.