IH 94 WB|IH 43 NB over STH 38|W WASHINGTON

0.22 MI N JCT GREENFIELD · County 079, Wisconsin · Built 1968 · 4 Lanes · 66,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B400286024B0000
Year Built
1968
Reconstructed
1987
Length
112.8 m (370.1 ft)
Max Span
35.1 m
Width
19.4 m (63.6 ft)
Lanes
4
Daily Traffic
66,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,455,000
Total Project Cost
$2,182,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.