CTH C over SUGAR RIVER

0.1 M E JCT CTH X · County 045, Wisconsin · Built 2023 · 2 Lanes · 470 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B23018100000000
Year Built
2023
Length
53.2 m (174.5 ft)
Max Span
26.2 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
470
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.