CTH X over SUGAR RIVER

2.3M N JCT CTH C · County 045, Wisconsin · Built 1969 · 2 Lanes · 189 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

42.7995, -89.486817

This bridge is in worse condition than 82.6% of bridges in County 045. The average bridge in Wisconsin is 0 years old; this one is 57 years old.

Nearby Bridges

Bridge Details

Structure #
P23096900000000
Year Built
1969
Length
56.4 m (185 ft)
Max Span
18.7 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
189
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.