CTH D over BR SUGAR RIVER

2.3M N JCT CTH C · County 045, Wisconsin · Built 2011 · 2 Lanes · 790 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B23016300000000
Year Built
2011
Length
9.3 m (30.5 ft)
Max Span
8.5 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
790
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.