CTH EE over SUGAR RIVER
0.4M W JCT CTH E · County 045, Wisconsin · Built 1967 · 2 Lanes · 750 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
42.734133, -89.4427
This bridge is in worse condition than 92.5% of bridges in County 045. The average bridge in Wisconsin is 0 years old; this one is 59 years old.
Nearby Bridges
CTH E over ALLEN CR
Built 2013
LRD TIN CAN RD over LITTLE SUGAR RIVER
Built 1977
LRD ENGLISH SETTLE over ALLEN CREEK
Built 1954
STH 59-MAIN ST over SUGAR RIVER
Built 1995
CTH F over TRIB TO SUGAR R
Built 2009
CTH C over SUGAR RIVER OVERFLOW
Built 1963
CTH C over SUGAR RIVER
Built 2023
LRD SCHNEEBERGER R over LITTLE SUGAR RIVER
Built 1977
LRD PURINTUN RD over BR LITTLE SUGAR RIVER
Built 1939
LRD DECT-ALBANY RO over SUGAR RIVER
Built 1982
Bridge Details
- Structure #
- P23011600000000
- Year Built
- 1967
- Length
- 57.1 m (187.3 ft)
- Max Span
- 21.3 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 750
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $655,000
- Total Project Cost
- $983,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.