CTH F over TRIB TO SUGAR R

0.1 M. S. JCT. STH 59 · County 045, Wisconsin · Built 2009 · 2 Lanes · 538 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B23016800000000
Year Built
2009
Length
7.9 m (25.9 ft)
Max Span
2 m
Lanes
2
Daily Traffic
538
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.