SULLIVAN ROAD (SB) over SPOKANE RIVER

0.25 N I-90 · County 063, Washington · Built 2016 · 4 Lanes · 28,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
088740000000000
Year Built
2016
Length
135.3 m (443.9 ft)
Max Span
34.7 m
Width
19.7 m (64.6 ft)
Lanes
4
Daily Traffic
28,100
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,742,000
Total Project Cost
$5,483,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.