SULLIVAN ROAD (NB) over SPOKANE RIVER
0.25 N I-90 · County 063, Washington · Built 1973 · 2 Lanes · 28,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.672486, -117.196542
This bridge is in worse condition than 51.1% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 53 years old.
Nearby Bridges
SULLIVAN ROAD (SB) over SPOKANE RIVER
Built 2016
SULLIVAN RD over I-90
Built 1985
SULLIVAN ROAD over BNSF RAILROAD
Built 1960
SULLIVAN ROAD (NB) over UNION PACIFIC RR
Built 1973
EVERGREEN RD over I-90
Built 2001
MISSION AVE over EVERGREEN RD
Built 2000
FLORA RD over I-90
Built 1957
SULLIVAN RD (SB) over UNION PACIFIC RR
Built 1967
SULLIVAN RD over SR 290 (TRENT AVE)
Built 1960
SR 27 over I-90
Built 1978
Bridge Details
- Structure #
- 081398000000000
- Year Built
- 1973
- Length
- 133.2 m (437 ft)
- Max Span
- 34.7 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 28,100
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,068,000
- Total Project Cost
- $16,137,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.