SULLIVAN RD over I-90
2.0 E JCT SR 27 · County 063, Washington · Built 1985 · 6 Lanes · 34,662 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.669342, -117.196733
This bridge is in worse condition than 51.1% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 41 years old.
Nearby Bridges
SULLIVAN ROAD (NB) over SPOKANE RIVER
Built 1973
SULLIVAN ROAD (SB) over SPOKANE RIVER
Built 2016
SULLIVAN ROAD over BNSF RAILROAD
Built 1960
SULLIVAN ROAD (NB) over UNION PACIFIC RR
Built 1973
EVERGREEN RD over I-90
Built 2001
MISSION AVE over EVERGREEN RD
Built 2000
FLORA RD over I-90
Built 1957
SULLIVAN RD (SB) over UNION PACIFIC RR
Built 1967
SULLIVAN RD over SR 290 (TRENT AVE)
Built 1960
SR 27 over I-90
Built 1978
Bridge Details
- Structure #
- 0012818A0000000
- Year Built
- 1985
- Length
- 57.6 m (189 ft)
- Max Span
- 30.8 m
- Width
- 34.1 m (111.9 ft)
- Lanes
- 6
- Daily Traffic
- 34,662
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,444,000
- Total Project Cost
- $8,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.