MISSION AVE over EVERGREEN RD
0.1 S I-90 · County 063, Washington · Built 2000 · 4 Lanes · 6,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.671083, -117.216944
This bridge is in worse condition than 18.1% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 26 years old.
Nearby Bridges
EVERGREEN RD over I-90
Built 2001
SULLIVAN RD over I-90
Built 1985
SULLIVAN ROAD (SB) over SPOKANE RIVER
Built 2016
SULLIVAN ROAD (NB) over SPOKANE RIVER
Built 1973
SR 27 over I-90
Built 1978
SR 27 over I-90
Built 1956
SULLIVAN ROAD over BNSF RAILROAD
Built 1960
SULLIVAN ROAD (NB) over UNION PACIFIC RR
Built 1973
SR 290 over SPOKANE RIVER
Built 1987
SR 290 over SPOKANE RIVER
Built 1967
Bridge Details
- Structure #
- 0015756B0000000
- Year Built
- 2000
- Length
- 57.9 m (190 ft)
- Max Span
- 30.8 m
- Width
- 20.3 m (66.6 ft)
- Lanes
- 4
- Daily Traffic
- 6,500
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,166,000
- Total Project Cost
- $4,332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.