Sand Dunes Rd over Moses Lake
Sand Dunes .6 S of Camas · County 025, Washington · Built 2015 · 2 Lanes · 412 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
47.083889, -119.333056
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 11 years old.
Nearby Bridges
SAND DUNE ROAD over MOSES LAKE SPILLWAY
Built 1962
I-90 over MOSES LAKE
Built 1958
I-90 over MOSES LAKE
Built 1958
SR 171 over I-90
Built 2001
HANSEN RD over I-90
Built 1958
PENINSULA DRIVE over I-90
Built 2001
I-90 over PELICAN HORN
Built 1958
I-90 over PELICAN HORN
Built 1957
POTATO HILL RD over I-90
Built 2006
ALDER STREET over PARKER HORN
Built 1958
Bridge Details
- Structure #
- 088720000000000
- Year Built
- 2015
- Length
- 17.4 m (57.1 ft)
- Max Span
- 17.4 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 412
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,210,000
- Total Project Cost
- $2,419,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.