POTATO HILL RD over I-90

1.5 E JCT SR 171 · County 025, Washington · Built 2006 · 2 Lanes · 4,037 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

47.102483, -119.278461

This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 20 years old.

Nearby Bridges

Bridge Details

Structure #
0017071A0000000
Year Built
2006
Length
40.5 m (132.9 ft)
Max Span
20.1 m
Width
21.4 m (70.2 ft)
Lanes
2
Daily Traffic
4,037
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,516,000
Total Project Cost
$3,032,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.