I-90 over MOSES LAKE
23.8 E JCT SR 281 · County 025, Washington · Built 1958 · 2 Lanes · 13,711 vehicles/day
Overall
Deck
8
Very Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
47.102608, -119.322758
This bridge is in worse condition than 87.2% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 68 years old.
Nearby Bridges
I-90 over MOSES LAKE
Built 1958
SR 171 over I-90
Built 2001
PENINSULA DRIVE over I-90
Built 2001
HANSEN RD over I-90
Built 1958
I-90 over PELICAN HORN
Built 1958
I-90 over PELICAN HORN
Built 1957
Sand Dunes Rd over Moses Lake
Built 2015
SAND DUNE ROAD over MOSES LAKE SPILLWAY
Built 1962
POTATO HILL RD over I-90
Built 2006
ALDER STREET over PARKER HORN
Built 1958
Bridge Details
- Structure #
- 0005705B0000000
- Year Built
- 1958
- Length
- 77.4 m (253.9 ft)
- Max Span
- 16.5 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 13,711
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,775,000
- Total Project Cost
- $5,550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.