SR 171 over I-90
JCT I-90 · County 025, Washington · Built 2001 · 4 Lanes · 11,072 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.100919, -119.316472
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 25 years old.
Nearby Bridges
I-90 over MOSES LAKE
Built 1958
I-90 over MOSES LAKE
Built 1958
PENINSULA DRIVE over I-90
Built 2001
I-90 over PELICAN HORN
Built 1958
I-90 over PELICAN HORN
Built 1957
HANSEN RD over I-90
Built 1958
Sand Dunes Rd over Moses Lake
Built 2015
SAND DUNE ROAD over MOSES LAKE SPILLWAY
Built 1962
POTATO HILL RD over I-90
Built 2006
ALDER STREET over PARKER HORN
Built 1958
Bridge Details
- Structure #
- 0015898A0000000
- Year Built
- 2001
- Length
- 67.7 m (222.1 ft)
- Max Span
- 33.8 m
- Width
- 24 m (78.7 ft)
- Lanes
- 4
- Daily Traffic
- 11,072
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,532,000
- Total Project Cost
- $7,065,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.