BASELINE EAST over WASTEWAY

Baseline 0.2 W of SR 17 · County 025, Washington · Built 1996 · 2 Lanes · 1,296 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
086338000000000
Year Built
1996
Length
10.4 m (34.1 ft)
Max Span
10.1 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,296
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$794,000
Total Project Cost
$1,588,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.