ROYAL BROUGHAM WAY over RAILROAD
ROYAL BROUGHAM & 4TH AVE · County 033, Washington · Built 2010 · 2 Lanes · 3,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
47.592414, -122.331825
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 16 years old.
Nearby Bridges
S-E RAMP over 4TH AVENUE
Built 2003
SR 99 OFF RAMP over RAMP AND TERRAIN
Built 2019
E-N RAMP over 4TH AVE BUILDINGS
Built 2003
SR 519 over STADIUM BNSFRR 4TH AVE
Built 2002
I-90 W-N RAMP over 4TH AVE AND SOUND TRANS
Built 2010
I-90 EB over BUS DEPOT PED PATH BLDNS
Built 2003
COLORADO AVE over SR 99
Built 2013
E-S RAMP over BUILDING PARKING LOT
Built 2003
ALASKAN WAY SOUTH over BNSF RR
Built 2013
N-E RAMP over 4TH AVE S
Built 2003
Bridge Details
- Structure #
- 088303000000000
- Year Built
- 2010
- Length
- 203 m (666 ft)
- Max Span
- 44.8 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $12,202,000
- Total Project Cost
- $24,404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.